The Sirte Free Zone includes advanced administrative and service buildings dedicated to operating companies. Shipping agencies, investors, developers, It is designed according to the highest standards to provide an ideal work environment, It is ready to use immediately.

The area also includes luxury residential units equipped with all amenities, To meet the needs of residents and visitors, This enhances the quality of life and provides an integrated residential environment that combines luxury and comfort.

The region includes 11 specialized and service areas. They are:

  1. Seaport and storage area.
  2. Financial Services District.
  3. Industrial Zone.
  4. Tourist area.
  5. Manufacturing Zone.
  6. The oil zone.
  7. Media Zone.
  8. Smart City.
  9. Water Plants and Wastewater Treatment.
  10. Electricity and water stations.
  11. Administrative Buildings: The main building of the district administration and the service buildings consist of (15) buildings.

Indoor and outdoor storage yards locations
2.8 hectares indoor courtyard
75 hectares outdoor courtyard
Outdoor yard in the Ouig area with an area of 40 hectares

Port Operational Specifications

– Annual operating capacity is 2 million tons.
– Ability to receive 8 commercial ships at the same time.
– Design depths of the port:

  • Harbour Entrance 11 Metres
  • Pelvic and rotation area 10 meters
  • Next to the sidewalks 9 meters


    🔹 The diameter of the turning area is 280 meters.
    🔹 Draft 7.5 meters.
    🔹 The maximum vessel tonnage is 17,000 tons.
    🔹 The length of the ship is 170 meters.
    🔹 The width of the vessel is 28.5 meters.

Sidewalk Lengths
West Pier 350 meters long
South Pier with a length of 570 meters
East Pier 370 meters long
Pier (RORO) 152 Meters

Completion rate of pavements

  • West Pier 350 Meters: 100% completion rate (ready to go).
  • RO-RO Pier 152 meters Completion Rate 100% (Ready to Operate).
  • South Pier: 550 meters completion rate 35% (continuous progress).
  • East Pier: 340 meters, 35% completion rate (continuous progress).
  • Dredging Works: 100% completion (to ensure optimal operational depths).

Marine Structures:

  1. 1150-metre main breakwater providing harbour protection
  2. . Diameter of rotation area: 280 meters to facilitate the movement of ships.